PAST PROJECTS
Producing well failure analysis of a GOM producer – failure linked to annulus pressure build-up
Choke line friction pressure simulation for an ultra-deepwater low temperature well
Analysis of APB and temperature induced well failure
Optimized well designs eliminating the need for tieback – saving ~3 days of operation
Well clean up flow data analysis for well operating limits calibration
Well design feasibility for Drill Stem Testing (DST)
Simulation of annulus pressure build up (APB) during drilling, DST and production – developed associate mitigation measures to prevent well failure
Well digital twin design to predict operational issues and recommend well operating pressure and temperature limit to preserve well integrity
Evaluation of well design capability to withstand blow out
Determination of well operating limit during production - well integrity management
Burst disk and syntactic foam design for deep water development project
Salt loading casing design for pre-salt deep-water exploration and development
Well construction risk analysis
Well construction feasibility studies – rig capacity, drill pipe requirement, pump capacities for onshore extended reach wells
Non-standard well load analysis for example point loading due to salt
Reengineering well designing thus eliminating the need for syntactic foam for APB mitigation – saving ~$1,000,000 per well
Evaluation of casing for DST loads – determination of maximum flow rate and/or duration to maintain well integrity during DST
Evaluation of barriers during well construction and operations – providing recommendations and developing bow-ties representing well barriers against identified risk
Preparation of well construction procedures
Simulation of annulus pressure build up (APB) during drilling, DST and production – developed associate mitigation measures to prevent well failure
Analysis of APB and temperature induced well failure
Impact of fracturing load and cement integrity on WellHealth®
Impact of fracturing load and cement integrity on WellHealth®
Analysis of annulus pressure build-up (APB) failure providing recommendations for future completion operation
Conductor failure – analysis of residual load on surface casing and clamp design to support surface casing.
Casing design studies from simple to complex
Well life production load analysis – influence of well barriers (mud, casing etc.) degradation
Our ability to tackle complex non-standard engineering problems and vast operator experience give us an edge over our competitors. Let us help you solve your puzzle!!!