PAST PROJECTS

Producing well failure analysis of a GOM producer – failure linked to annulus pressure build-up

Choke line friction pressure simulation for an ultra-deepwater low temperature well

Analysis of APB and temperature induced well failure

Optimized well designs eliminating the need for tieback – saving ~3 days of operation

Well clean up flow data analysis for well operating limits calibration

Well design feasibility for Drill Stem Testing (DST)

Simulation of annulus pressure build up (APB) during drilling, DST and production – developed associate mitigation measures to prevent well failure

Well digital twin design to predict operational issues and recommend well operating pressure and temperature limit to preserve well integrity

Evaluation of well design capability to withstand blow out

Determination of well operating limit during production - well integrity management

Burst disk and syntactic foam design for deep water development project

Salt loading casing design for pre-salt deep-water exploration and development

Well construction risk analysis

Well construction feasibility studies – rig capacity, drill pipe requirement, pump capacities for onshore extended reach wells

Non-standard well load analysis for example point loading due to salt

Reengineering well designing thus eliminating the need for syntactic foam for APB mitigation – saving ~$1,000,000 per well

Evaluation of casing for DST loads – determination of maximum flow rate and/or duration to maintain well integrity during DST

Evaluation of barriers during well construction and operations – providing recommendations and developing bow-ties representing well barriers against identified risk

Preparation of well construction procedures

Simulation of annulus pressure build up (APB) during drilling, DST and production – developed associate mitigation measures to prevent well failure

Analysis of APB and temperature induced well failure

Impact of fracturing load and cement integrity on WellHealth®

Impact of fracturing load and cement integrity on WellHealth®

Analysis of annulus pressure build-up (APB) failure providing recommendations for future completion operation

Conductor failure – analysis of residual load on surface casing and clamp design to support surface casing.

Casing design studies from simple to complex

Well life production load analysis – influence of well barriers (mud, casing etc.) degradation

Our ability to tackle complex non-standard engineering problems and vast operator experience give us an edge over our competitors. Let us help you solve your puzzle!!!

CONTACT US

LOCATIOIN

1127 Eldridge Pkwy Suite 300
Houston, TX 77077
USA

EMAIL

info@prozzane.com

Call Us